3D fence mesh welding machine

3D fence mesh is a type of security fencing It is commonly used in high-security areas such as military facilities, prisons, airports, playground etc. Our fence mesh welding machine is the pneumatic type, which adopts the European technology. Energy saving air cylinder used on the machine, which save users’ power consumption and cost. Working speed of the machine can be max.120times/min.
Privacy Policy: Samples are free within a certain price range

Machine Specification and Video

Model DP-FP-2500A+
Working speed 100-120times/min
Wire thickness 3-8mm
Line wire space 3-6mm, 50-300mm;

6-8mm, 100-300mm

Cross wire space 50-300mm
Mesh width Max. 2500mm
Panel mesh length Max.6M/12M
Welding electrodes 51pcs
Welding transformer 150kva*9pcs

Advantage of Mesh Welding Machine

Different types energy-saving air cylinder, you can choose as your budget.

Electrical control cabinet: Panasonic(Japan), Weinview(Taiwan), Schneider(French), ABB (Switzerland) components, all word famous brand, control the machine woking stable.

European design line wire feeding device: Panasonic servo motor control wire feeding, SMC air cylinder clamp the wire, wire block make wires align.

Cross wire feeding device: hopper device can load max. 1T wire, motor & reducer control the wire feeding, step motor control wire falling.

Auxiliary Equipment

Mesh bending machine

Triangle bending machine

After-sales Service

Installation and commissioning: Our engineer can go to your factory to install and commission the equipment to ensure the normal operation of the equipment.

Technical training: We will provide detailed operation and maintenance training book to enable your employees to operate the equipment proficiently.

24-hour online service: Reply your message timely when you have question on the machine.

Spare parts supply: Ensure to supply the original spare parts.

FAQ

Q: How to set the mesh length of the machine?

A: The mesh length can be set on the touch screen.

Q: Can I know the payment terms of your company?

A: 30%T/T in advance, 70% by T/T before machine loading.

Q: How many labors needed to work the machine?

A: 2-3 workers.

Q: Can you make the machine as our local voltage?  

A: Yes, we can make the voltage as your requirements.

Q: Delivery time of the machine

A: 40 days after receiving the advance payment.

Finished Product

Close Inquiry Basket

Send Inquiry
Close

Send Inquiry
Close
SearchMail to me!Tel to me!WhatsappBack to top